Dockstation operations

A dock on top of Tara Street

The project Dockstation sits on top of Dublin Fire Brigade’s Tara Street headquarters, at the centre of a planned 5 km operational area over the city.

Map of the planned 5 km operational radius over Dublin City centred on Tara Street
Tara Street

Dock location, on Dublin Fire Brigade HQ

5 km

Planned radius of the operational area

09:00–17:00

Mon–Fri live U-Space hours from Month 8

2 stages

Stage 1 report at Month 10, Stage 2 at Month 15

How a mission works

From call-out to review

01

Tasking

A scheduled city-services task or an incident call-out starts a mission.

02

Authorisation

The flight is authorised and tracked through the USSP.

03

Launch

The drone leaves the dock and flies to the site, beyond visual line of sight.

04

Live view

A live overhead video feed reaches the operator or incident command.

05

Capture

Imagery and flight data are captured into the Digital Twin.

06

Review

Mission playback and data review support assessment and evidence.

Testing and assessment

Two stages of Dockstation testing

Stage 1 D3 · Month 10

Dockstation Performance, Stage 1

Initial testing and assessment of the Dockstation within Dublin City U-Space, supporting DCC public services.

Regulatory Technical Operational Commercial Usefulness Cost / benefit
Stage 2 D4 · Month 15

Dockstation Performance, Stage 2

Advanced testing integrated with multi-operator activity, including DCC, Dublin Fire Brigade, An Garda Síochána, Civil Defence, the Coast Guard and Dublin Port where relevant.

Multi-operator Multi-agency Regulatory Cost / benefit
Operating responsibly

Compliance at every dock site

Dockstation demonstrators are provided by GeoAerospace.

Aviation

Confirm the category (Open, Specific or Certified) and SORA/PDRA requirements for each dock site

Assess BVLOS range and flight paths for each operation

Consider U-Space requirements for every flight

Data protection

A data protection impact assessment for each dock site

Retention limits and anonymisation of faces and plates as standard procedure

Clear data residency and storage architecture

Cybersecurity

Alignment with NCSC guidance, NIS2, ISO 27001 and Cyber Fundamentals (CyFun)

Breach notification plan covering dock storage as well as the cloud

AI and human oversight

Each on-board AI function classified separately under the EU AI Act

Human oversight of automatic launch and tracking triggers

Automatic logging of autonomous triggers and decisions